- Construction of slab for Airtel Cable Landing Station (CLS)’s equipment at Tangibovu, in Kinondoni, Dar es Salaam, including grid connection, earthing and electrical wiring.
- Construction of boundary wall (850m long) at Kunduchi Beach Lutheran Church and Airtel CLS that includes guard and washroom facilities at Tangibovu, in Kinondoni, Dar es Salaam.
- Construction of dispensary buildings, school latrines, maternity wards, and hand wash facilities at eight (8) different locations in the country.
- Design & installation of suspended acoustic ceiling tiles (12m above the floor) at Ubungo Anglican Church, Dar es Salaam.